Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) priority inventory scheduling system.
B) first in, first out inventory processing system.
C) just-in-time inventory control system.
D) ABC inventory system.
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) unfortunately had no effect on
B) actually decreased
C) increased
D) splintered
Correct Answer
verified
Multiple Choice
A) statistical process control
B) just-in-time inventory control
C) lean manufacturing
D) flexible manufacturing
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) most costly to complete.
B) on the priority bar of the PERT chart.
C) near the end of the PERT network.
D) on the critical path of the PERT network.
Correct Answer
verified
Multiple Choice
A) it basically eliminates the need for human intervention.
B) it saves on materials costs.
C) it permits customization without a significant increase in price.
D) it produces a higher quality product, which allows the manufacturer to charge more.
Correct Answer
verified
Multiple Choice
A) relies heavily on labor, since humans are more adaptable than machines.
B) uses machines designed to perform multiple tasks so they can be used to produce a variety of products.
C) achieves its flexibility at the cost of much slower rates of production than mass production techniques.
D) is only possible when using mass-production processes.
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) 1 day
B) 1 week
C) 2 weeks
D) 1 month
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) reducing time to market
B) using ERP techniques
C) replacing labor with machinery
D) switching to a more service-oriented product mix
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Showing 21 - 40 of 321
Related Exams